Inspection
TCS HYDRO offers the following services:
- Integrated survey of hydro turbine equipment (hydraulic turbines and valves), determination of the scope of work required for its refurbishment, modernization or repair.
- Formulation of requirements specifications for a Customer for designing and supply of new hydro turbine equipment (hydraulic turbines and valves), its retrofitting or repair.
- Visual inspection of all the systems and facilities of hydraulic power plants/pumped storage power plants being in operation with preparation of a corresponding technical report specifying their conditions and drawing up a list of activities required for their retrofitting.
- Integrated assessment of the hydraulic unit performance:
- Analysis of energy and power characteristics of hydraulic units over the control valves’ entire opening range so that to define the acceptable modes of operation.
- Determination of a potential for increasing power and extending the range of operation modes.
- Analysis of reasons causing degradation of the hydraulic turbine dynamic characteristics and drawing up recommendations on their elimination.
- Characterization of control elements.
- Transient analysis (load shedding, optimization of start/stop/change-over to synchronous condenser mode, etc.).
- Determination of optimum gate-blade relationship in Kaplan turbines.
- Determination of discharge coefficient by relative method so that to specify the flow rate through a turbine.